---
product_id: 86136901
title: "10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV"
brand: "finesse cables"
price: "€ 14.48"
currency: EUR
in_stock: false
reviews_count: 8
url: https://www.desertcart.com.cy/products/86136901-10m-hdmi-cable-v1-4-lead-high-speed-long-lead
store_origin: CY
region: Cyprus
---

# Supports PS4/Xbox 10m length ARC & Dolby support 10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV

**Brand:** finesse cables
**Price:** € 14.48
**Availability:** ❌ Out of Stock

## Summary

> 🎉 Elevate Your Entertainment Experience!

## Quick Answers

- **What is this?** 10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV by finesse cables
- **How much does it cost?** € 14.48 with free shipping
- **Is it available?** Currently out of stock
- **Where can I buy it?** [www.desertcart.com.cy](https://www.desertcart.com.cy/products/86136901-10m-hdmi-cable-v1-4-lead-high-speed-long-lead)

## Best For

- finesse cables enthusiasts

## Why This Product

- Trusted finesse cables brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Key Features

- • **Durable Design:** Double shielded and PVC wrapped for ultimate protection.
- • **Unmatched Length:** Experience 10 meters of freedom in your setup!
- • **Future-Proofed Audio:** Supports advanced audio formats like Dolby Atmos.
- • **High-Speed Performance:** Enjoy crystal-clear 1080p visuals at 60Hz.
- • **Universal Compatibility:** Connects seamlessly with all your favorite devices.

## Overview

The Finesse Cables 10M HDMI Cable v1.4 is a high-speed, long lead cable designed for optimal audio-visual performance. With gold-plated connectors, it supports resolutions up to 1080p at 60Hz and is compatible with a wide range of devices including gaming consoles, TVs, and projectors. Its durable design ensures longevity, while features like Ethernet and ARC support enhance your home cinema experience.

## Description

Product Description Professional quality HDMI Cables for Home and Business use High grade licensed HDMI cables Our range of v1.4 HDMI cables are a simple way to connect all your standard 2K 1080p resolution devices. We provide an extensive range to suit almost every requirement including 1m, 2m, 3m, 5m, 10m, 15m, 20m, 25m, 30m, 40m & our super long 50m cables. Precision construction using high grade materials ensure no singnal drop off, easily meeting HDMI v1.4 specifications. Our products are all offically licensed by HDMI ensuring quality. Our v1.4 cables support HD resolutions from 720p, 1080i and 1080p at 60Hz. Please note, these cables are NOT suitable for 4K 2160p UHD, for this specification, you will require our v2.0 or Fibre Optic products. These cables will work with: CCTV, Xbox One & 360, Playstation 3 & 4 (PS3, PS4), Nintendo Switch, SKY HD, Freeview/Free Sat, FIre TV, PC, Laptops Projectors and other similar devices all up to 2k resolution. FAQ's Q: What version is this HDMI cable? A: These are high speed HDMI v1.4 cables, with a bandwidth speed of 10.2Gbps. Q: Do these cables work with 4K 2060p UHD A: No, these cables will only work on resolutions up to 1080p or 2K Q: Will these work with my SKY TV box or SKY Q? A: Yes, they will, but only at the lower HD resolution of 2K (1080p), they will NOT work on the higher 4K resolution. Q: Do these leads work on a Virgin Cable box? A: Yes, but as per with SKY it will only work on the lower resolution settings. Q: Are these officially licensed HDMI cables? A: Yes, and they meet all HDMI standards. Q: Do your cables support ARC (Audio Return Channel)? A: Yes Q: Will these work with Dolby Atmos? Q: Can these cables work from a Laptop to a Projector A: Yes, absolutely, however they will only work up to 1080p 2k at 60hz, so you need to ensure your settings are correct. Q: Will these work on an Xbox or Playstation? A: Yes, but again, only at 2k / 1080p, they will not work if you have your console set to 4k/2160p output. Q. Are these cables suitable for running outside? A: You can run these cables outside, but ONLY with waterproof trunking. These cables are not waterproof. Q. Will these cables work with an HDMI splitter? A: Yes, in general these cables should work fine with most HDMI splitters, preferably powered splitters. Additional Help Q: I have plugged the cable in and I am not getting a picture A: Please check you are only trying to send a resolution of 2k/1080p, higher resolutions will require a different cable. A: Some devices have quite a low output on the HDMI port which can cause a weak signal on longer leads, please test our cable on another device. Q: Can I run these cables through walls to other rooms? A: Yes, but it’s important to test the cable prior to running to ensure compatibility with your set-up. A: You should also note that you should very carefully feed cables through channelling, whilst the cables are strong, pulling then harshly through a wall may well damage them.

Review: Good quality products. - Product as described, arrived next day , used to install a second monitor on my CCTV working fine ,
Review: Excellent - Unfortunately it stopped working after 3 days so it was returned very disappointed

## Features

- [10 meter HDMI cable] - High speed HDMI to HDMI v1.4 long cables include Ethernet and ARC. Our connectors are gold plated providing excellent audio-visual signal transmission for vibrant picture and sound. Please note this cable is suitable for resolutions up to 2k HD 1080p at 60hz, it does not support 4k.
- [High Quality] - All Finesse Cables HDMI are manufactured under official license from HDMI. They are double shielded to protect from interference and wrapped in a durable PVC covering to allow easy routing without risk of damage.
- [Universal Compatibility] – Finesse HDMI Cables are compatible with a wide range of devices that support HDMI. These include TV, CCTV, Sky, Playstations, Xbox, Projectors, Home Cinema, DVD Players, Sound Bars, Freeview Boxes, Games consoles, PC, Laptops. These cables are suitable for resolutions up to 1080p
- [High specification] – All Finesse Cables are high in specification including Ethernet, 3D and ARC (Audio Return Channel) support. Your TV soundbar and home cinema HD surround sound audio are covered including 5.1 & 7.1 Dolby Atmos and DTS X audio. High picture resolutions from 720p, 1080i and 1080p at up to 60Hz. Crystal clear picture and sound even across our longer length cables.
- [Wide range] - Finesse cables offer a huge range of professional quality HDMI cables from 1m - 50m (v1.4 2k 1080p). All have a 2-year warranty as standard.

## Technical Specifications

| Specification | Value |
|---------------|-------|
| ASIN | B07GZR5YX7 |
| Best Sellers Rank | 1,430 in HDMI Cables |
| Brand | Finesse Cables |
| Cable Type | HDMI |
| Cable type | HDMI |
| Colour | Black |
| Compatible Devices | TV, Playstation, Xbox, DVD, CCTV, Sky TV, Cable, PC, Laptop, projector, home cinema, AV |
| Compatible Phone Models | No Compatible Phone Models |
| Compatible devices | TV, Playstation, Xbox, DVD, CCTV, Sky TV, Cable, PC, Laptop, projector, home cinema, AV |
| Compatible phone models | No Compatible Phone Models |
| Connectivity Technology | HDMI |
| Connector Gender | Male-to-Male |
| Connector Type | HDMI |
| Connector type | HDMI |
| Customer Package Type | sealed anti-static bag |
| Customer Reviews | 4.5 out of 5 stars 914 Reviews |
| Data Transfer Rate | 18 Gigabits Per Second |
| Ethernet Cable Category | Cat 6 |
| Frequency | 60 Hz |
| Indoor Outdoor Usage | Indoor |
| Item Shape | Round |
| Item Weight | 500 Grams |
| Manufacturer | Finesse Goods |
| Manufacturer Part Number | HDMI |
| Model Name | HDMI V1.4 |
| Model Number | HDMI V1.4 |
| Number of Items | 100 |
| Number of Pins | 19 |
| Other Special Features of the Product | Low Voltage |
| Outer Material | [Predicted] PVC |
| Recommended Uses For Product | Connecting DVD players, games consoles, projectors, cable & satellite boxes to TV screen. PC and Laptops to monitors |
| Special feature | Low Voltage |
| Specification Met | hdmi |
| UPC | 604565186294 |
| Unit Count | 1.0 count |

## Product Details

- **Brand:** Finesse Cables
- **Cable type:** HDMI
- **Compatible devices:** TV, Playstation, Xbox, DVD, CCTV, Sky TV, Cable, PC, Laptop, projector, home cinema, AV
- **Connector type:** HDMI
- **Special feature:** Low Voltage

## Images

![10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV - Image 1](https://m.media-amazon.com/images/I/71tHPbk2f6L.jpg)
![10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV - Image 2](https://m.media-amazon.com/images/I/6196jFLzeRL.jpg)
![10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV - Image 3](https://m.media-amazon.com/images/I/61x7DWAEVsL.jpg)
![10M HDMI Cable v1.4 lead HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV - Image 4](https://m.media-amazon.com/images/I/51EhmBjw2sL.jpg)

## Available Options

This product comes in different **Colour Name, Size Name** options.

## Customer Reviews

### ⭐⭐⭐⭐⭐ Good quality products.
*by B***N on 2 February 2020*

Product as described, arrived next day , used to install a second monitor on my CCTV working fine ,

### ⭐⭐⭐⭐⭐ Excellent
*by D***R on 18 January 2022*

Unfortunately it stopped working after 3 days so it was returned very disappointed

### ⭐⭐⭐⭐ What you expect.
*by P***N on 7 July 2022*

They’re ok, do the job no fuss or frills !

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.com.cy/products/86136901-10m-hdmi-cable-v1-4-lead-high-speed-long-lead](https://www.desertcart.com.cy/products/86136901-10m-hdmi-cable-v1-4-lead-high-speed-long-lead)

---

*Product available on Desertcart Cyprus*
*Store origin: CY*
*Last updated: 2026-09-11*